Day 02 of 15

On site: Carpenter

Bathroom fitters in south London, two fitters and an electrician

The part that lasts is the part you never see.

Scroll through one bathroom, fitted in 15 days. Every stage stays under the one that covers it.

Stage 1 of 8

Stripped to board

  1. Stage 1: Stripped to board
  2. Stage 2: Sealed first
  3. Stage 3: Stone where water goes
  4. Stage 4: Floor to the drain
  5. Stage 5: Glass and rain
  6. Stage 6: Walnut and stone
  7. Stage 7: Lit and wired
  8. Stage 8: Ready on day 15

Stage 1 of the bathroom: stripped to board

Stage 1 of 8. Day 2 of 15, on site: Carpenter

Stripped to board

Stage 2 of the bathroom: sealed first

Stage 2 of 8. Day 3 of 15, on site: Waterproofer

Sealed first

left to cure for a day

Stage 3 of the bathroom: stone where water goes

Stage 3 of 8. Day 6 of 15, on site: Tiler

Stone where water goes

Stage 4 of the bathroom: floor to the drain

Stage 4 of 8. Day 8 of 15, on site: Tiler

Floor to the drain

Stage 5 of the bathroom: glass and rain

Stage 5 of 8. Day 10 of 15, on site: Plumber and glazier

Glass and rain

10 mm toughened glass

Stage 6 of the bathroom: walnut and stone

Stage 6 of 8. Day 12 of 15, on site: Joiner and plumber

Walnut and stone

Stage 7 of the bathroom: lit and wired

Stage 7 of 8. Day 14 of 15, on site: Electrician

Lit and wired

IP44 lights near the shower

Stage 8 of the bathroom: ready on day 15

Stage 8 of 8. Day 15 of 15, on site: Handover

Ready on day 15

Priced from the board up

Every price carries the membrane, the falls and the pipework as lines you can read, not as a surprise on day 4.

How a job runs

  1. Survey

    Free, about an hour. The fitter lifts a tile where one is loose, to see the board and the pipes behind it.

  2. Quote

    One page with a line for every stage in the film. The membrane, the falls and the pipework are priced on their own.

  3. Fit

    One team from board to lights, the same fitter on site every day, and a photo of each stage before it is covered.

  4. Handover

    The shower runs for twenty minutes with you in the room. Then the photos are yours, with two years on the work.